-
Latest Version
-
Operating System
macOS 10.14 Mojave or later
-
User Rating
Click to vote -
Author / Product
-
Filename
OmniPlan-3.14.4.dmg
-
MD5 Checksum
bee5ffdffba16d9aa74ea9880240fd42
Sometimes latest versions of the software can cause issues when installed on older devices or devices running an older version of the operating system.
Software makers usually fix these issues but it can take them some time. What you can do in the meantime is to download and install an older version of OmniPlan 3.14.4.
For those interested in downloading the most recent release of OmniPlan for Mac or reading our review, simply click here.
All old versions distributed on our website are completely virus-free and available for download at no cost.
We would love to hear from you
If you have any questions or ideas that you want to share with us - head over to our Contact page and let us know. We value your feedback!
What's new in this version:
OmniPlan 3.14.4
- Scheduling: Restored ability to set different values for Effort and Duration on tasks without resources assigned.
OmniPlan 3.14.3
- Documentation: updated the reference manual
- Omni Automation [PRO]: various Omni Automation improvements. Detailed notes about automation API changes in this release can be found in the API Reference Release Notes.
- Timelines: addressed a bug that could cause date headers to fail to display on a Mac running a beta OS
- Crash Reporting: OmniPlan crash reports can now be submitted on a Mac running a beta OS
OmniPlan 3.14.2
- Licensing: improved app licensing stability and reliability
- Server Repository [PRO]: fixed a crash that could occur when downloading a project for a Server Repository
OmniPlan 3.14.1
- In-App Purchase: Mac App Store customers who previously upgraded from Standard to Pro are no longer blocked from accessing Pro features
- Omni Automation: fixed a bug that could prevent OmniPlan from recognizing Omni Automation plug-in bundles
- Localizations: restored localized in-app help documentation.
OmniPlan 3.14
- Licensing: customers who own a site license or team subscription can now sign into OmniPlan to unlock it. Please contact [email protected] if you are interested in learning more about these licensing options.
- Omni Automation [PRO]: custom data can now be read & written by Omni Automation
- Server Accounts [PRO]: the “Accounts…” OmniPlan menu item has been renamed “Server Accounts…” for clarity
- Import: additional column types in Map Columns window no longer appear disabled
- Microsoft Project Import [PRO]: addressed a compatibility issue that blocked OmniPlan from importing some Microsoft Project files. Please contact Omni’s support team if you notice inconsistencies or unexpected scheduling in projects imported by this version of OmniPlan.
- Network View: the Task Name field in the Inspector no longer loses focus when entering a task name in Network View.
- Omni Automation [PRO]: fixed a number of bugs related to Omni Automation
- Resource Leveling: fixed a bug that could cause unexpected time off for a resource when leveling
- Templates: projects created from templates that include a publishing collaboration action now sync correctly
- Stability: fixed a crash that opening a project that contains a milestone with no name
- Stability: addressed a bug that could cause OmniPlan to crash opening projects with hammock tasks in the project schedule
- Stability: OmniPlan now presents an error message instead of crashing when publishing fails for a project that includes multiple publishing actions
OmniPlan 3.13.2
- Omni Automation [PRO]: the Automation API Reference window is no longer blank
- Scrolling: fixed a bug that prevented vertical scrolling by clicking and dragging on the scrollbar
- Stability: addressed a crash that could occur attempting to download a project from a server repository
OmniPlan 3.13.1
- Omni Automation [PRO]: Omni Automation plug-ins can now be managed in the new “Plug-Ins” window (accessed from the Automation menu in the menu bar)
- Calendar Sharing Actions [PRO]: subscribing to a web calendar with a never-ending event no longer causes OmniPlan to hang
- Catalina Compatibility: fixed compatibility issue with a system change in macOS Catalina that could cause previous versions of OmniPlan to write corrupted change logs. Files corrupted while running previous versions of OmniPlan on macOS Catalina can be successfully opened by this version of OmniPlan.
- Catalina Notifications Alert: earlier releases of OmniPlan included unused software update logic to present a system notification when an update was available. While this code wasn’t ever actually presenting any notifications, its presence triggers a prompt on macOS Catalina asking for permission to allow notifications. You could safely answer “Don’t Allow” in earlier releases of OmniPlan, and we’ve now removed this unused logic so the prompt won’t be presented unnecessarily going forward.
- OmniPlan Files: it is no longer possible to open multiple copies of a single OmniPlan project via Finder. (To view the same OmniPlan project in multiple windows, use the “New Window on…” menu bar item)
- Stability: fixed a crash that could occur exporting Reports on macOS Catalina
OmniPlan 3.13
- Omni Automation [PRO]: OmniPlan now provides cross-platform and cross-application automation via JavaScript
- Automation Plug-Ins and Actions [PRO]: save bundles of scripts (called plug-ins) for quick access from the Automation menu in a project
- Automation Console [PRO]: using OmniPlan’s Automation Console (in the Automation menu) you can write JavaScript directly in OmniPlan, execute it, and see the results in a project
- Sync & Sharing Actions [PRO]: the “Run a Script” Sync & Sharing action can now be configured to execute an Omni Automation Plug-In
- Network View: changes to the View Options in the Network View are now respected when exporting and printing
- Performance: improved performance opening projects with very wide Gantt charts
- Scheduling: fixed scheduling bugs related to split tasks and hammock tasks
- Sync & Sharing Actions [PRO]: publishing to an image format now always respects the view selected when configuring the action (instead of exporting the active view)
OmniPlan 3.12.3
- Microsoft Project Import [PRO]: Improved performance importing Microsoft Project files
- Calendar Actions [PRO]: Addressed a bug related to repeating calendar events and improved URL calendar subscription stability
- Templates: New documents created from built in templates no longer include a pending change
OmniPlan 3.12.2
- Network View: deleted tasks now disappear properly from the Network View
- Printing: fixed a bug that could cause OmniPlan to hang when printing
- Sync & Sharing [Pro]: fixed a bug that could block interaction with the Sync & Sharing sheet when editing an account
- Stability: improved Change Tracking stability
OmniPlan 3.12.1
- Change Tracking: The Hide Changes menu item once again hides the Change Tracking status bar as well as the Change Tracking sidebar
- Effort Calculation: Effort in weeks is now calculated properly in projects with daily granularity
- Gantt: Completing a milestone in a group is now immediately reflected in the group task bar’s completion state
- Layout: Addressed a few interface layout issues that were introduced in the previous release
- Printing: Fixed a bug that could cause group and hammock tasks to draw incorrectly when printing to PDF
- Scrolling: Chevrons in Gantt now scroll properly when task outline is scrolled
- Stability: Attempting to cancel publishing no longer crashes
- Stability: Fixed a scheduling crash
OmniPlan 3.12
- Network View: full tasks names are now displayed in the Network View
- Network View: task data is now displayed in a tooltip when the cursor is hovered over a variable in a task node (helpful when the variable is too long to be fully displayed in the node)
- CSV Export: CSV exports now include additional Duration & Effort columns that display values in the smallest unit configured in the Project Formats Inspector
- Change Tracking: reduced crowding in the Change Tracking bar by moving the Accept All and Reject All options into a gear menu
- Dark Mode: improved Dark Mode appearance throughout OmniPlan
- Leveling: Leveling a project now schedules uncompleted tasks for the beginning of the next project work day (previous versions of OmniPlan 3 scheduled tasks for the beginning of the current work day when leveling)
- Network View: network View now automatically scrolls to reveal the leftmost task node
- Catch Up: text entered in the Catch Up as of box is no longer ignored if you click OK before hitting tab or enter
- CSV Import/Export: exported CSV files now import correctly in non-English localizations
- Dashboard [PRO]: the Resources option in the Dashboard’s View menu now stays disabled when the option is unchecked
- Filters: the applied filter is no longer removed after new changes to the filter are saved
- Filters: fixed a bug that could cause a “Custom” filter to be applied instead of a newly saved named filter
- Gantt: group completion now redraws correctly in the Gantt when a milestone is marked complete
- Group Tasks: fixed a bug that could cause group task durations to display a blank or incorrect value
- HTML Reports [PRO]: report templates with multiple uses of a given looping token now produce the correct output
- HTML Reports [PRO]: fixed a bug that could cause the Resource Timeline to be cut off in the Report window
- Leveling: fixed a bug that could cause leveling involving split tasks to hang
- Network View: enabling a task variable with a long title no longer causes other data in task nodes to truncate
- Network View: the Critical Path menu item now toggles critical path state in the Network View correctly
- OmniGraffle Export: fixed a bug that could result in incorrect dependency lines or missing tasks when exporting to OmniGraffle
- Performance: improved Resource View performance
- Printing: printing now respects visible scale when Zoom has been used to adjust Gantt scale
- Scheduling: OmniPlan no longer presents unnecessary “The end date must come before start date” alerts when opening some projects
- Schedule Exceptions: daylight Savings Time no longer causes unexpected exceptional days to appear in workweek schedules that include Sundays
- Server Accounts [PRO]: account Name field now corrects capitalization in Omni Sync Server account names
- Task Inspector: changing a task’s type in the Inspector no longer discards pending task title changes
- Task Notes: OmniPlan no longer allows you to attempt to paste an image into the Notes field
- Task Outline: disabled the pop-up calendar in the task outline when working with projects that use undetermined dates
- Templates: fixed a bug using the Edit a Copy option in the Templates Preference pane
- Undetermined Date Entry: OmniPlan once again supports entering “T-” for task dates in projects with undetermined dates
- Violations: resolved violation icons now disappear from task outline correctly after leveling
- Stability: sorting resources by resource type no longer causes OmniPlan to crash
- Stability: improved overall app stability
OmniPlan 3.11.2
- Image Export: Fixed a bug that could cause group and hammock tasks to draw incorrectly when exporting to PDF, PNG, JPEG, or TIFF
OmniPlan 3.11.1
- Calendar Actions [PRO]: Fixed a bug that could cause Resource schedule exceptions configured via a “Sync Work Hours from a Calendar” action to become Project schedule exceptions after a project is closed and re-opened
- Alert Text: Removed unnecessary characters from permission alerts
- Stability: Fixed a crash opening linked files from the Attachments column in the outline
OmniPlan 3.11
- Dark Mode: OmniPlan now supports system Dark Mode on macOS Mojave. When your Mac’s Appearance is set to Dark in System Preferences, OmniPlan’s interface will automatically switch to Dark Mode. Running OmniPlan in Dark Mode does not affect styles in OmniPlan projects - if you’d like to update your project’s styles to better match Dark Mode, use the Styles View to customize your project’s background and text colors
- Network View: Network View’s background color now matches the Project Background Color specified in Styles View
- Templates: OmniPlan now includes “Dark” themed variations of the built-in templates
- Help: OmniPlan’s Help has been updated with information about working in Dark Mode
- Show Scheduling Influences: The appearance of the Show Scheduling Influences popover has been updated
- Styles View: We’ve removed the extraneous button for opening the Fonts Windows from the bottom row of Styles View
- Change Conflicts: Clicking on the number of conflicts in the Change Tracking bar no longer auto-resolves conflicts
- Filters: Fixed a bug editing filter rules for “Focused” filters
- Filters: Filter name changes are now saved successfully
- Filter Rules: The default size of the filter rules editor is now taller on macOS Mojave
- Gantt View: Adding a task no longer causes the area before the project’s start date to flicker in the Gantt
- Imports: Clicking Cancel in the Import Column Mapping window now cancels the import (previously, OmniPlan would import the file anyway)
- Outline: It is no longer possible to lay text out vertically in the outline view
- Stability: Fixed a crash that could occur when creating a child task
OmniPlan 3.10.4
- Google Calendar [PRO]: Copies of OmniPlan downloaded from the Mac App Store are now able to successfully authenticate Google Calendar accounts
- Resource Load Syncing [PRO]: Fixed a bug that could cause resources to appear incorrectly overloaded when a project is configured to sync resource loads with a server repository
- Stability: Fixed a crash that could occur when importing some Microsoft Project files
OmniPlan 3.10.3
- Help: OmniPlan’s Help has been updated with information about the new Sync & Sharing workflow
- Help: The Custom Template Tokens chapter has been updated with additional tokens
- Server Accounts Window [Pro]: The Server Accounts window now refreshes automatically when opened
- Applescript Actions [PRO]: Cancelling an edit to an Applescript action no longer causes the action description to change
- Calendar Actions [PRO]: Fixed a bug that could result in incorrect schedule exceptions when switching a calendar subscription action between project hours and hours for a specific resource
- Collaboration [PRO]: Improved sync performance by reducing the number of changes OmniPlan saves in the changelog when syncing with a server repository
- Collaboration [PRO]: Fixed a bug that could cause local copies of a synced project to become out of sync with the server
- Dutch Localization: The “Any” filter option is no longer missing in Dutch
- Localizations: The new Sync & Sharing workflow is now fully localized
- Server Accounts Window [PRO]: Server accounts no longer display both the server contents and an error message when they are unable to connect
- Trial: OmniPlan’s Trial period is once again compatible with non-Gregorian calendars
- Stability: Fixed a crash editing a task’s title after it was deleted in Network View
OmniPlan 3.10.2
- Export Actions [PRO]: Projects that contain export actions with no filter configured no longer trigger an error
OmniPlan 3.10.1
- Sync & Sharing Options [PRO]: The layout of the Actions table in the Sync & Sharing Options has been updated slightly
- Dutch Localization: Correct form of “group” is now used in Resource view
- Calendar Actions [PRO]: Addressed an error that could occur when syncing dates with a Calendar action
- File Duplication: Duplicating an existing project via File > Duplicate no longer triggers a permissions error
- Inspectors: Inspector tabs now display properly on macOS 10.12 Sierra
- Monte Carlo Simulations [PRO]: Cost projections now accurately calculate cost for tasks that have prerequisite groups
- Network View: Exporting or printing the Network View no longer causes OmniPlan to hang
- Stability: Fixed a crash that could occur when publishing to a local calendar with a filter applied
- Stability: Saving a file to a location that does not support OmniPlan’s file system identifier no longer crashes
- Stability: Entering a resource’s email address after dismissing the “Sync Work Hours” action no longer triggers a crash
OmniPlan 3.10
- OmniPlan 3.10 for Mac and the corresponding iOS release, OmniPlan 3.10 for iOS, contain changes to how OmniPlan identifies projects as distinct from one another. If you’re syncing OmniPlan projects between multiple devices via a publishing & subscription collaboration action, you should update all installations of OmniPlan to the most recent version
- Publishing and subscription actions are now configured and managed in a fully redesigned interface. To create or edit a publishing and subscription action, select the new Sync & Sharing Options… item in the Project menu (previously, this menu item was titled Configure Publishing & Subscriptions…)
- The new Server Accounts window, accessed via the Accounts item in the OmniPlan menu, provides streamlined access to the features that were previously split between the Accounts pane of OmniPlan’s Preferences, the Open From Server Repository window, and the Server Repository window
- OmniPlan now detects when a file that is configured to sync with a server repository has been duplicated in Finder, and offers to sync the duplicated file as a distinct project to the server. This reduces the possibility for dataloss when duplicating synced files
- OmniPlan now supports Google Calendar’s modern authentication API. When configuring a Google calendar account in OmniPlan it is now no longer necessary to set up an application-specific password for your account or enable account access to less secure apps
- It is now possible to configure an image publishing action that publishes the Network Diagram or Resource Timeline to PDF, PNG, TIFF, or JPEG
- OmniPlan now refers to getting changes to a subscription action as “refreshing” the action (in previous versions of OmniPlan this was referred to as “updating” the action, which many users found confusing). The menu bar and toolbar options for this functionality reflect the new name for this functionality, but you can still use the old Update keyboard shortcut if you’d like to
- OmniPlan no longer offers to set up a “Sync task to/from Calendar Server reminders” publishing action, as support for this functionality has been dropped by Apple
- OmniPlan no longer includes previously configured sync and sharing actions when publishing a project to a server repository for the first time
- Changes to a task’s duration in a Google or Apple Calendar now sync back to OmniPlan successfully
- Fixed a bug that could cause OmniPlan Standard to attempt to access publishing & subscription actions that were configured while running OmniPlan Pro in trial mode
- Fixed a bug that could cause OmniPlan to hang when attempting to schedule a task assigned to a resource with no available work hours
- Data in custom columns now exports to Microsoft Project
- Publishing to an image format now respects the view selected when configuring the action (instead of exporting the active view)
- Updating a webcal subscription twice no longer causes the extra & off hours to disappear from the calendar
- Fixed a crash that could occur when refreshing with an AppleScript action configured
- Fixed a crash that could occur when undoing leveling
- Additional bug and crash fixes
OmniPlan 3.9.3
- Dashboard: The tooltip that appears when hovering your cursor over resource allocation bars in the Dashboard window now properly calculates resource utilization when the resource’s usage data is synced between multiple projects
OmniPlan 3.9.2
Addresses an error importing Microsoft Project files and fixes a handful of recently reported bugs:
- Estimate at Completion is now computed as EAC = AC+(BAC-EV)/CPI
- Monte Carlo Reports now include a project “Cost to Achieve” value in addition to milestone values
- The “New” option in OmniPlan’s File menu no longer appears active while running OmniPlan without a license
- The tooltip that appears when hovering your cursor over resource allocation bars in the Dashboard window now displays accurate information about task assignments
- It is no longer possible to enter an end date before the start date in the Dashboard custom timescale date fields
- Custom timescale date fields now remain editable if the View popover has been closed and re-opened
- Localized content has returned to OmniPlan’s in-app Help
- Fixed a bug that could cause some projects to hang while leveling
- Microsoft Project files that previously triggered “Error Code 5” import errors now import successfully
- Fixed a crash that could occur when editing a date field
OmniPlan 3.9.1
- Outline View: Editing a task title that wraps to more than one line no longer causes the title to disappear temporarily
OmniPlan 3.9
- OmniPlan 3.9 for Mac introduces the Project Summary Inspector, which provides quick access to values like your project’s total duration or cost. This release also includes enhancements to OmniPlan Pro’s Dashboard feature, like the ability to customize the visible timescale, as well as a wide range of bug and crash fixes
Changes:
- Project Summary Inspector: The new Project Summary Inspector displays total project duration, effort, variance, completion %, and cost
- Dashboard: It is now possible to change the visible timescale for a Dashboard via the View options in the toolbar. Select a preset date range, or specify a custom range
- Dashboard: The Dashboard Project column is now resizable, allowing for longer project titles to be displayed. Hovering your cursor over a truncated project title also now reveals a tooltip with the full title
- Dashboard: Total project effort is now included in Project Stats
- Dashboard: The appearance of the Actual/Baseline schedule pop-up button in the Dashboard has been updated
- Help: OmniPlan’s Help content has been updated with explanations of the new functionality included in this release. A couple instances of out of date information and typos in the Help have also been corrected
- Inspector: Date options in Project Formats Inspector are now displayed in a more logical order
- Printing: Page Attribute options have been slightly rearranged in the Report printing dialogue
- Calendar View: All four corners of the Normal Hours/Extra & Off Hours controller in the Calendar View sidebar are now rounded
- Dashboard: A tooltip with project and task assignment information now reliably appears when hovering your cursor over resource allocation bars in the Dashboard window
- Dashboard: Resource list now opens full height after checking “Show Resources” in the Dashboard View Options
- Document Windows: Documents opened in multiple windows now re-open to correct state after they are closed
- Export: Fixed a bug that could cause missing date headers when exporting a project to PDF or TIFF
- Gantt: Off Hours schedule exceptions now display when View â–¸ Non-Working Time â–¸ Holidays is selected in the OmniPlan menu bar
- Leveling: Fixed a bug that could cause gaps in the project schedule when leveling in some specific scenarios
- Leveling: Addressed a bug that could cause resource assignments to appear wrong after leveling in some combinations of Resource & Resource Group assignments
- Localizations: “Sign Up for the Omni Newsletter” and “Intro Video” menu items are now localized
- Microsoft Project Export: Fixed a bug in OmniPlan’s Microsoft Project export tool that could cause cost information to export incorrectly
- Microsoft Project Import: Microsoft Project 2016 files no longer import with locked task dates
- Microsoft Project Import: Fixed a bug that could cause milestone dates to not import correctly from Microsoft Project files
- Monte Carlo Simulations: Monte Carlo Simulation reports now include best-case and worst-case cost values
- Network View: Fixed a bug that could cause unnecessary connections to draw in the Network Diagram
- Resource View: Addressed a bug that could cause icons in the Resource Type column to appear blurry on some displays
- Task Outline: Making a change in the Inspector no longer discards pending task title edits
- Stability: Fixed a crash that could occur when setting an end date earlier than a start date while working in Network View
- Stability: Addressed a crash that could occur when disconnecting an external display or enabling AirPlay to an AppleTV
OmniPlan 3.8.1
- Outlines - Addressed a bug that could cause outline text to disappear or appear black
- PDF Export - Row background color is once again preserved when exporting outlines to PDF
OmniPlan 3.8
- OmniPlan 3.8 for Mac introduces support for importing and exporting elapsed time values to and from Microsoft Project. This release also fixes numerous bugs and crashes
- Microsoft Project — OmniPlan now supports importing and exporting Microsoft Project elapsed time values
- Intro Video — OmniPlan now presents an introductory video the first time the application is launched
- Newsletter — Added a link to sign up for the Omni Newsletter to the OmniPlan Help menu
- Project Leveling — Leveling is now reset when project dates are switched from specific to undetermined
- Calendar View — Header text is no longer too crowded in the Calendar View
- Dashboards — Addressed a bug that caused resources to appear to be idle when they were not
- Export — Exporting an OmniGraffle file now creates a file with the appropriate canvas settings enabled
- Gantt View — Scrolling in the Gantt View with the Scheduling Influences popover visible no longer squishes explanation text
- Gantt View — Selecting “Hide Gantt” when the Inspector is visible now hides the Gantt chart completely
- Groups Tasks — Fixed a bug that could cause group tasks durations to temporarily stop recalculating
- Localizations — TouchBar labels are now fully localized
- Publish/Subscribe — Lead/lag time changes now properly update when a project is synced via a server repository
- Microsoft Project — Fixed various bugs related to OmniPlan’s Microsoft Project import/export support
- Network View — Network diagram now lays out properly when task nodes contain additional non-default variables
- Styles View — It is no longer possible to undo the completion of the default complete task
- Task Outline — Adjustments to the Title column width are now properly saved
- Task Outline — Empty white space now draws to the right when columns in the task outline are adjusted to be smaller than the width of the outline sidebar
- Violations — Undoing after leveling no longer creates bogus violations when tasks are assigned to a group which contains a resource that has less than 100% units
- Stability — Fixed a crash that could occur when hiding the project Gantt
- Stability — Adding a new task in the Network diagram no longer triggers a crash when there is a dependency loop in the project schedule
- Stability — Fixed a crash that could occur in the Styles View if undo is used while editing a template task’s name
- Stability — Fixed a crash that could occur when leveling some projects
- Stability — Addressed a bug that could cause the TouchBar to get into a state that would trigger a crash
- Stability — Deleting the duration value in the leveling dialogue no longer triggers a crash
- Stability — Fixed a crash that could occur when reopening a file saved in the Styles View
OmniPlan 3.7.3
About: Restored missing App icon in the About panel
Calendar View: Fixed a High Sierra compatibility issue that could cause only Monday to be displayed in Calendar View
OmniPlan 3.7.2
- Filtering: Fixed a bug that could prevent filters from saving values for effort, duration, and variance
- Filtering: OmniPlan no longer allows attempting to sort a filtered flat list
- Import: Tasks imported from .ooutline files now import in the correct order
- Inspectors: Restored “0” place holder value to lead/lag field
- Localizations: The in-app Help is once again localized
- Microsoft Project Import: Fixed a regression in our Microsoft Project import tool that could cause some .mpp files to fail to import
- Localizations: Dashboards are fully localized again
- Network View: Fixed a bug that caused some variables not to update correctly in Network view
- Performance: Improved Inspector performance when switching between tasks in a large OmniPlan project
- Resources: OmniPlan now cleans up references to resources that no longer exist in a file (these references could cause OmniPlan to hang or crash)
- Scheduling: Resource leveling no longer ignores project non-working days
- Scheduling: Tasks now immediately reschedule to a resource’s next working period after a resource is assigned
- Scheduling: “Resources Work Independently” once again correctly respects earliest resource availability
- Task Cost: Fixed a bug that caused OmniPlan to fail to read task cost for tasks with fixed durations
- Stability: Attempting to edit a value in the read-only Hierarchical Title column no longer triggers a crash
- Stability: Fixed a crash that could occur when attempting to undo leveling
- Stability: Addressed a crash computing critical path when a schedule recursion is encountered in projects that share resource loads
- Stability: Fixed a bug that could cause OmniPlan to crash when opening a file with external dependencies
- Stability: Selecting “Add Dependent” in the contextual menu no longer triggers a crash
- Stability: Fixed a crash that could occur when outdenting a task that is part of a dependency loop
- Stability: Fixed a bug that could cause OmniPlan to crash when using Help > Contact Omni to send in an anonymized file
OmniPlan 3.7.1
- Gantt: Addressed a bug that could prevent changing the duration of a task by dragging in the Gantt if the “Adjust Assigned Amounts” resource allocation option is selected
- Inspectors: Addressed a layout bug that could cause the end of a project’s Gantt chart to be hidden “under” the Inspector sidebar
- Scheduling: Restored the ability to set effort and duration independently when no resource is assigned to a task
- Scheduling: Restored the ability to change a task’s effort via the Inspector or task outline when the task’s resource allocation is set to “adjust task effort.”
- Scheduling: It is once again possible to enter negative values for task lead/lag time
- Stability: Fixed a crash that could occur when leveling splits a task in a dependency loop
- Stability: Addressed a crash that could occur when deleting a task with a prerequisite
OmniPlan 3.7
- Elapsed Duration: OmniPlan now supports elapsed time values for task duration and lead/lag time! By default, OmniPlan calculates task duration and lead/lag time from the project’s work hours. Entering an “e” before either value will now convert it to an elapsed time value instead. Need to wait for the paint to dry before you can take the next step in your project? Enter “48eh” in your “Let paint dry” task’s duration field to tell OmniPlan that the next dependent task can begin Monday morning if the paint has started to dry by the end of the day Friday (and assigning additional resources to watch the paint dry won’t help it complete any earlier). OmniPlan does not yet support importing or exporting Microsoft Project elapsed time values
- Menu Bar: The Gantt, Resource Timeline, and Calendar, as well as the outlines in each of these views, can now be hidden or revealed by options in the View menu in the OmniPlan menu bar
- OmniOutliner: Added import support for OmniOutliner 5’s .ooutline file format
- Import: Importing .tsv files is now supported
- Help: The in-app Help is now localized in all languages except for Korean and Brazilian Portuguese
- Outline: Columns in the outline can now be resized by dragging the divider line (previously, columns could only be resized by selecting the column header)
- Scheduling: Cleaned up and rewrote the code OmniPlan uses to schedule project timelines. This is intended to make project scheduling more accurate by addressing things like rounding errors. As a result, you may notice slight changes in your project’s schedule after installing this update. If you are confused about why your project’s schedule as changed, or feel that it has changed in a way that it shouldn’t have, please contact our Support team
- Publish/Subscribe: Substantial updates were made to OmniPlan’s publish/subscribe mechanism in order to improve speed and better handle authentication challenges
- AppleScript: AppleScript now properly sets project level custom data values
- Calendar View: Clicking the green “Customized Work Week” icon now switches to Calendar View to reveal the resource’s work schedule
- Calendar View: It is once again possible to clear a resource’s customized work schedule
- Change Tracking: The change tracking sidebar has been disabled in the Styles View as this view does not support change tracking
- Change Tracking: Addressed a typo in the resource assignment change tracking message
- Change Tracking: Change tracking now correctly reports changes that affect both task duration and task effort
- Daylight Savings Time: Daylight Savings Time beginning or ending no longer confuses OmniPlan’s date display
- Earned Value: ACWP values now calculate correctly when a resource is assigned at less than 100% to a task
- Export: End constraint brackets are no longer backwards when exporting to PDF
- Gantt View: Addressed a bug that could cause dependency connection arrows to remain on the Gantt chart after tasks are disconnected
- Inspectors: Addressed a bug that could prevent editing dependencies for some tasks in the Task Inspector
- Microsoft Project Import: Fixed a variety of bugs that could block Microsoft Project files from importing correctly
- Network View: It is now possible to edit the name of a task in Network View while zoomed out
- Network View: The Network View no longer scrolls back to the beginning of the project after a task is deleted
- Network View: “Add Task” with a child task selected in the Network Diagram now creates a task in the same group
- Performance: Setting a start constraint 100 years in the past no longer causes performance issues
- Publish/Subscribe: OmniPlan now syncs more happily with Server.app
- Publish/Subscribe: Addressed a bug that could cause pub/sub actions to duplicate. This bug was most commonly encountered when a file with pub/sub actions was also being syncing via OmniPresence
- Publish/Subscribe: Trust certificate panel now appears for self-signed WebDAV servers
- Publish/Subscribe: It is now possible to delete more than one project at a time from the Server Repository window
- Resource View: Resources can once again be assigned by dragging resources from the Resource View outline to tasks in a swim lane
- Scheduling: Tasks set to “adjust assigned amounts” no longer max resource allocation out at 100% (as a result, resources now accurately indicate when they are overloaded)
- Scheduling: Removing all work hours from a project no longer results in tasks with no effort and duration
- Split Tasks: Split tasks now remain split when the first half of the task is dragged in the Gantt chart
- Task Completion: Addressed a rounding error that could cause tasks to be > 99% complete instead of 100% complete
- Stability: Constraints that result in a scheduling recursion now present a violation instead of causing OmniPlan to crash
- Stability: The Resource Assignments Touch Bar button no longer triggers a crash when resources have unexpected names
- Stability: Fixed our most common crash in OmniPlan 3.6.2
OmniPlan 3.6.2
- In-App Purchase price now properly reflects previous Standard purchase
- OperaOpera 114.0 Build 5282.144
- PhotoshopAdobe Photoshop CC 2024 25.12
- OKXOKX - Buy Bitcoin or Ethereum
- Hero WarsHero Wars - Online Action Game
- Adobe AcrobatAdobe Acrobat Pro 2024.002.20854
- TradingViewTradingView - Track All Markets
- ParallelsParallels Desktop 20.1.1
- 4K Video4K Video Downloader+ 1.9.3
- CleanMyMacCleanMyMac X 4.15.8
- 4DDiG4DDiG Mac Data Recovery 5.2.2
Comments and User Reviews